The launch of Tap by Tap Oliver started on May 1, Town of Oliver residents are encouraged to pick-up free energy and water savings kits, 200 of which are available on a first-come first-served basis at Oliver Town Office, 6150 Main Street. The Energy and Water Savings Kit (Kit) includes one water-saving showerhead, and aerators […]
Archives for May 2012
Win a BBQ for Oliver at President’s Choice
President’s Choice is giving away a town BBQ for 5000 people through the food network. I was wondering if this could be put on your ODN and see if OLIVER can get nominated. Check it out at www.foodnetwork.ca/pc This would be GREAT for our town….. Check out our facebook page at www.facebook.com/oliversupervalu Oliver Super Valu
Rising trend – rivers, creeks, water courses
High Streamflow Advisory: South Interior The BC River Forecast Centre is issuing a High Streamflow Advisory for small and medium-sized rivers in the South Interior including: • Boundary • Okanagan • Similkameen A few days of warmer weather earlier this week has seen a transition in mountain snowpacks from accumulating snow to melting snow. Snow […]
Evacuation alert issued for Regal Ridge
The Regal Ridge Subdivision on Anarchist Mountain has been placed on an evacuation alert. *** Officials for the Regional District of Okanagan Similkameen gave notice to 11 homes on the Raven Hill Road and Nine Mile Place, that they may be required to evacuate due to a potential water and debris flow caused by a […]
Commenting
Do you read the comments? Probably the most interesting part of the blog. Use FREE events and FREE classifieds on Oliver Daily News as well. Some restrictions apply – look for information on that at top of each of those pages.
Desert Sun – open house Tuesday
Roxie Van Aller, executive director of Desert Sun invites you to join her at an open house in Osoyoos next Tuesday May 15 – 4 to 6 PM at the organization’s offices on 72nd Avenue. Call for more information 498-2538 graphic by Kickstart Printing
Lot of fun about my spellin !
A new beginning
Footings for the east wing of SOSS now going in. Picture shot from the north drive way into the pit. Once the east wing basement is constructed – equipment inside the old bunker can be moved over and the chimney brought down. That should be complete before September.





