Foot of Veteran’s Way near Tourism Centre.
Town of Oliver says:
We are currently working on re-purposing a 14″ water mainline pipe that directly feeds to the reservoirs. This line was stagnant and not being used since we shut down our CPR and Lions Pump Houses because of higher uranium levels in the water.
Now we will have a 12″ mainline that comes from the Tuc-el-nuit area, intersecting with the reservoir mainline, giving us more flexibility of filling the reservoirs. It just makes our water system a little more versatile.
Shawn Goodsell | Director of Operations

