Oliver agricultural water system starts as a diversion from a river at McIntrye Bluff and goes above ground in a ditch for many miles – with frequent dips to large underground pipes. Most of those dips constructed in recent memory for a system that was first totally designed for gravity to push the water through.
You could write a book on this 22 km water system. It requires a lot of maintenance.
All pictures from the south side of main Town crossing pipeline.
Road Two – looking north
Road Three – looking south and going underground
Road Seven – two types of concrete – reguluar slanted sides and rectangular box
Road Eleven – canal ends and goes underground to Road 18 Pump House.