Just south of VDS 13 on Okanagan River – tree removal and some excavating taking place.
ODN is checking to see what is behind this.
At least one traveler upset with the lack of communications as the east side of the dike is closed.
See previous item – Letter to the Editor
Shaun Reimer, Hydrotechnical Engineer, of MOE told us late today – some repairs to west side of river with rip rap being placed at toe of dyke to add strength.
Also, on the west of Okanagan River near the ORRI project – some holes appeared in the paved portion and a beaver dam was spotted.
MOE is doing a number of things in that area to restore safety and full function of the river.
