Pink spray paint indicates where new water line will cross Secrest Hill Rd to travel up the east side of the curvy road to the very top.
Director of Engineering at the RDOS Doug French believes it can all be done before June 13 or even before.
Up at the top a crew easily installed new piping to showers and toilets at Loose Bay because of the sandy flat conditions in the campsite. Manager Yvon Ferland seen in background says that work got done quickly on Friday.