In the foreseeable future – the headline should be true.
After two winters in portables – the students are finished with them, the trailersĀ are moving off the site this week (in the plan) with undergrounds services on the south of the new buildings needing to be installed very soon.
The portables will be taken away in waves – the first the school classrooms that surrounded the flooring that is gone in the above picture.
Other portables will follow with the last one the admin building going to the airport later this summer.
